IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0057 # 12 Y:2016 12 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,971 $8,516 Not Implemented
IP0057 # 13 Y:2016 13 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $440 Implemented
IP0057 # 14 Y:2016 14 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,183 $7,207 Not Implemented
IP0057 # 15 Y:2016 15 2016 RECOVER WASTE HEAT FROM EQUIPMENT $464 $1,038 Not Implemented
IP0057 # 16 Y:2016 16 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $190 $664 Implemented
IP0057 # 17 Y:2016 17 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $8,619 $30,789 Not Implemented
IP0057 # 18 Y:2016 18 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $534 $2,607 Implemented
IA0550 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,680 $73,899 Implemented
IA0550 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,410 $8,190 Implemented
IA0550 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,340 $397 Implemented
IA0550 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,684 $140 Not Implemented
IA0550 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $671 $3,170 Implemented
IA0550 # 06 Y:2016 06 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,127 $4,280 Implemented
IA0550 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $540 $1,300 Implemented
WV0518 # 01 Y:2016 01 2016 UPGRADE CONTROLS ON COMPRESSORS $17,135 $20,642 Implemented
WV0518 # 02 Y:2016 02 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,399 $914 Implemented
WV0518 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,512 $706 Implemented
WV0518 # 04 Y:2016 04 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,556 $43,115 Not Implemented
WV0518 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,416 $500 Implemented
WV0518 # 06 Y:2016 06 2016 REPAIR OR REPLACE STEAM TRAPS $6,437 $7,861 Implemented
WV0518 # 07 Y:2016 07 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,361 $21,950 Implemented
WV0518 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $5,682 $3,428 Implemented
WV0518 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $2,986 $510 Implemented
WV0518 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $2,441 $1,398 Not Implemented
WV0518 # 11 Y:2016 11 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,011 $128 Implemented