IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,374

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0649 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $6,156 $1,439 Implemented
WV0649 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,255 $3,000 Implemented
WV0649 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,203 $4,464 Not Implemented
WV0649 # 05 Y:2023 05 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,620 $1,500 Implemented
WV0649 # 04 Y:2023 04 2023 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,248 $20,166 Not Implemented
WV0649 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $10,514 $13,660 Not Implemented
WV0649 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $19,114 $9,160 Implemented
KS2320 # 01 Y:2023 01 2023 ISOLATE HOT OR COLD EQUIPMENT $5,723 $1,804 n/a
KS2320 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,340 $60 n/a
KS2320 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,903 $0 n/a
KS2320 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,227 $16,176 n/a
KS2320 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $54,630 $421,943 n/a
MZ0343 # 01 Y:2023 01 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,951 $31,059 n/a
MZ0343 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,711 $360 n/a
MZ0343 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,510 $9,100 n/a
MZ0343 # 04 Y:2023 04 2023 REPAIR AND ELIMINATE STEAM LEAKS $8,146 $1,330 n/a
MZ0343 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,303 $5,150 n/a
MZ0343 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,575 $28,807 n/a
MZ0343 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,726 $2,400 n/a
MZ0343 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $126,570 $196,842 n/a
MZ0343 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $175,679 $545,812 n/a
GT0968 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,657 $1,850 Implemented
GT0968 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $104,725 $13,000 Implemented
GT0968 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,640 $23,680 Implemented
GT0968 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,052 $3,250 Implemented