IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,374

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1060 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,544 $17,274 Implemented
UD1057 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $9,795 $480 Implemented
UD1057 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $332 $1,200 Implemented
UD1057 # 03 Y:2023 03 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,326 $2,880 Not Implemented
UD1057 # 04 Y:2023 04 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $133 $413 Not Implemented
UD1057 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,173 $0 Implemented
UD1057 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,974 $952 Implemented
UD1057 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $767 $3,117 Not Implemented
UD1057 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,676 $13,290 Implemented
UD1057 # 09 Y:2023 09 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,273 $24,175 Not Implemented
UD1057 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $7,417 $31,038 Not Implemented
LT8376 # 01 Y:2023 01 2023 USE RADIANT HEATER FOR SPOT HEATING $7,532 $8,500 n/a
LT8376 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $210 n/a
LT8376 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,881 $31,854 n/a
TT0292 # 01 Y:2023 01 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $28,974 $250 Not Implemented
TT0292 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,314 $15,941 Implemented
TT0292 # 03 Y:2023 03 2023 AIR CONDITION ONLY SPACE NECESSARY $8,884 $18,000 Implemented
TT0292 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,900 $600 Not Implemented
TT0292 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,004 $4,240 Not Implemented
TT0292 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,057 $2,190 Implemented
TT0292 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,223 $4,750 Implemented
TT0292 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,268 $50 Implemented
IP0171 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,033 $0 Not Implemented
IP0171 # 02 Y:2023 02 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,240 $0 Not Implemented
IP0171 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,706 $517 Not Implemented