Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0507 # 06 Y:2021 | 06 | 2021 | ELIMINATE/REDUCE AN OPERATION | $2,822 | $3,300 | Implemented |
SU0507 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,661 | $7,939 | Not Implemented |
SU0507 # 08 Y:2021 | 08 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,521 | $22,840 | Not Implemented |
SU0507 # 09 Y:2021 | 09 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $375 | $1,259 | Implemented |
WV0609 # 11 Y:2021 | 11 | 2021 | INSULATE BARE EQUIPMENT | $1,192 | $1,293 | Implemented |
WV0609 # 12 Y:2021 | 12 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $487 | $1,350 | Implemented |
WV0609 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $78,485 | $318,088 | Not Implemented |
WV0609 # 02 Y:2021 | 02 | 2021 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $13,040 | $40,560 | Not Implemented |
WV0609 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $9,397 | $42,210 | Not Implemented |
WV0609 # 04 Y:2021 | 04 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $5,784 | $14,420 | Implemented |
WV0609 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,695 | $3,480 | Implemented |
WV0609 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,657 | $140 | Implemented |
WV0609 # 07 Y:2021 | 07 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $3,040 | $809 | Implemented |
WV0609 # 08 Y:2021 | 08 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,444 | $7,620 | Not Implemented |
WV0609 # 09 Y:2021 | 09 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,405 | $1,500 | Implemented |
WV0609 # 10 Y:2021 | 10 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,211 | $3,175 | Implemented |
UU0186 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,919 | $19,705 | Implemented |
UU0186 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,932 | $15,000 | Not Implemented |
UU0186 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,796 | $4,794 | Not Implemented |
UU0186 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $822 | $1,645 | Implemented |
UU0186 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $544 | $200 | Implemented |
UU0186 # 06 Y:2021 | 06 | 2021 | ADD AREA LIGHTING SWITCHES | $398 | $883 | Implemented |
UK2101 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,574 | $6,800 | n/a |
UK2101 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $68,186 | $12,380 | n/a |
UK2101 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $102,514 | $43,405 | n/a |