Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
261
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK2101 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,574 | $6,800 | n/a |
UK1916 # 05 Y:2019 | 05 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $4,922 | $11,550 | n/a |
UK1916 # 01 Y:2019 | 01 | 2019 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,170 | $0 | n/a |
UK1916 # 02 Y:2019 | 02 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $18,894 | $0 | n/a |
UK1916 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,394 | $25,674 | n/a |
UK1916 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $195 | $75 | n/a |
UK1916 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,402 | $2,614 | n/a |
UK1916 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,602 | $2,270 | n/a |
UK1916 # 08 Y:2019 | 08 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,946 | $0 | n/a |
UK1916 # 09 Y:2019 | 09 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $86,132 | $206,000 | n/a |
UK1916 # 10 Y:2019 | 10 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $139,706 | $225,000 | n/a |
UK1908 # 08 Y:2019 | 08 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $914 | $720 | Not Implemented |
UK1908 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,319 | $0 | Implemented |
UK1908 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,190 | $3,038 | Implemented |
UK1908 # 03 Y:2019 | 03 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $116,074 | $438,000 | Implemented |
UK1908 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $553 | $227 | Not Implemented |
UK1908 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,676 | $22,903 | Implemented |
UK1908 # 06 Y:2019 | 06 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,551 | $0 | Implemented |
UK1908 # 07 Y:2019 | 07 | 2019 | DISCONNECT BALLASTS | $383 | $72 | Implemented |
UK1908 # 09 Y:2019 | 09 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,838 | $1,900 | Implemented |
UK1908 # 17 Y:2019 | 17 | 2019 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,430 | $0 | Implemented |
UK1908 # 15 Y:2019 | 15 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $63,247 | $2,368 | Implemented |
UK1908 # 16 Y:2019 | 16 | 2019 | INSULATE BARE EQUIPMENT | $13,639 | $18,226 | Not Implemented |
UK1908 # 11 Y:2019 | 11 | 2019 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $13,831 | $5,000 | Not Implemented |
UK1908 # 18 Y:2019 | 18 | 2019 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $21,879 | $28,230 | Not Implemented |