Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0132 # 05 Y:2018 05 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,767 $0 Implemented
UU0132 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $2,708 $3,750 Not Implemented
UU0132 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,203 $0 Not Implemented
UU0132 # 09 Y:2018 09 2018 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $584 $0 Not Implemented
UU0082 # 01 Y:2005 01 2005 USE CORRECT SIZE STEAM TRAPS $32,790 $20,000 Not Implemented
UU0082 # 02 Y:2005 02 2005 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $36,280 $0 Not Implemented
UU0082 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $784 $4,300 Not Implemented
UU0082 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,720 $540 Not Implemented
UU0082 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $786 $600 Not Implemented
UU0068 # 06 Y:2004 06 2004 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $12,376 $1,292 Implemented
UU0068 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,004 $244 Implemented
UU0068 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $5,006 $8,929 Not Implemented
UU0068 # 03 Y:2004 03 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,381 $7,500 Not Implemented
UU0068 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,711 $3,315 Not Implemented
UU0068 # 01 Y:2004 01 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $21,193 $325 Implemented
UU0066 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $81 $270 Not Implemented
UU0066 # 01 Y:2004 01 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,690 $3,000 Not Implemented
UU0066 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $340 $200 Not Implemented
UU0066 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $84 $310 Implemented
UU0066 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $241 $45 Implemented
UU0066 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $199 $80 Not Implemented
UU0066 # 07 Y:2004 07 2004 PAY BILLS ON TIME TO AVOID LATE FEES $414 $0 Implemented
UU0059 # 01 Y:2004 01 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,130 $9,651 Not Implemented
UU0059 # 07 Y:2004 07 2004 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $12,192 $8,860 Not Implemented
UU0059 # 06 Y:2004 06 2004 INSTALL SKYLIGHTS $32,748 $272,000 Not Implemented