Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
181
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1107 # 08 Y:2024 | 08 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,517 | $1,048 | n/a |
OK1107 # 07 Y:2024 | 07 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $461 | $354 | n/a |
OK1107 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,278 | $792 | n/a |
OK1107 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,963 | $3,416 | n/a |
OK1107 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,461 | $20,075 | n/a |
OK1107 # 02 Y:2024 | 02 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $99,540 | $804,825 | n/a |
OK1107 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,098 | $353,808 | n/a |
OK1107 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,761 | $0 | n/a |
OK0861 # 07 Y:2013 | 07 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $22,838 | $54,080 | Not Implemented |
OK0861 # 11 Y:2013 | 11 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $65,536 | $250,000 | Not Implemented |
OK0861 # 08 Y:2013 | 08 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $960 | $1,500 | Not Implemented |
OK0861 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,478 | $1,026 | Not Implemented |
OK0861 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,425 | $1,378 | Not Implemented |
OK0861 # 09 Y:2013 | 09 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $12,086 | $2,710 | Not Implemented |
OK0861 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,689 | $13,383 | Not Implemented |
OK0861 # 10 Y:2013 | 10 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $53,906 | $518,400 | Not Implemented |
OK0861 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,427 | $1,250 | Implemented |
OK0861 # 04 Y:2013 | 04 | 2013 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $834 | $3,110 | Not Implemented |
OK0861 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $377 | $9,558 | Not Implemented |
OK0843 # 10 Y:2013 | 10 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $704 | $280 | Not Implemented |
OK0843 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,466 | $0 | Implemented |
OK0843 # 09 Y:2013 | 09 | 2013 | INSTALL SET-BACK TIMERS | $709 | $1,288 | Not Implemented |
OK0843 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $413 | $875 | Not Implemented |
OK0843 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,402 | $1,000 | Implemented |
OK0843 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,261 | $20,748 | Implemented |