IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0977 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,128 $14,000 n/a
GT0977 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,957 $1,500 n/a
GT0977 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $85,518 $1,850 n/a
GT0977 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,327 $12,892 n/a
GT0977 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $72,598 $1,299,381 n/a
CL2016 # 07 Y:2020 07 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Implemented
CL2016 # 08 Y:2020 08 2020 RECOVER WASTE HEAT FROM EQUIPMENT $4,055 $2,500 Implemented
CL2016 # 06 Y:2020 06 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $797 $0 Implemented
CL2016 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $967 $400 Not Implemented
CL2016 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,257 $43,750 Not Implemented
CL2016 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,376 $1,720 Implemented
CL2016 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $5,838 $656 Implemented
CL2016 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,588 $3,733 Implemented
CL1911 # 04 Y:2019 04 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $7,094 $0 Not Implemented
CL1911 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,429 $250 Not Implemented
CL1911 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,115 $4,000 Not Implemented
CL1911 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,300 $34,518 Not Implemented
CL1901 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,368 $13,023 Implemented
CL1901 # 03 Y:2019 03 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,184 $0 Implemented
CL1901 # 02 Y:2019 02 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,260 $0 Implemented
NC0568 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179,170 $887,700 Implemented
NC0568 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $306,868 $500 Not Implemented
NC0568 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $2,121 $3,123 Not Implemented
NC0568 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,081 $200 Implemented
NC0568 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,495 $22,028 Not Implemented