IAC logo
IAC Assessment: CL2016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL2016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2020
Principal Product Automotive parts
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 10,994
Annual Production 500,000 Pieces
Production Hrs. Annual 6,672
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $420,232 3,688,160 kWh $0.11
Electricity Demand $6,051 2,685 kW-months/year $2.25
Electricity Fees $7,875 - $ -
Natural Gas $14,809 1,292 MMBtu $11.46
TOTAL ENERGY COSTS $456,275
RECOMMENDED SAVINGS* $44,446 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,222
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,588
Cost:
$3,733
$11,190 98,212 $398 177 - - $11,190
98,212
kWh
$398
177
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,838
Cost:
$656
$5,838 51,241 - - - - $5,838
51,241
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,376
Cost:
$1,720
$1,372 12,041 $4 2 - - $1,372
12,041
kWh
$4
2
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,257
Cost:
$43,750
$18,275 160,391 $982 436 - - $18,275
160,391
kWh
$982
436
kW-months/year
-
-
MMBtu
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$967
Cost:
$400
- - $967 429 - - -
-
kWh
$967
429
kW-months/year
-
-
MMBtu
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$797
Cost:
-
$797 6,998 - - - - $797
6,998
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$567
Cost:
-
$567 4,979 - - - - $567
4,979
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,055
Cost:
$2,500
- - - - $4,055 283 -
-
kWh
-
-
kW-months/year
$4,055
283
MMBtu
TOTAL RECOMMENDED Savings:
$44,446
Cost:
$52,759
$38,040 333,861 $2,351 1,043 $4,055 283 $38,040
333,861
kWh
$2,351
1,043
kW-months/year
$4,055
283
MMBtu
TOTAL IMPLEMENTED Savings:
$24,222
Cost:
$8,609
$19,765 173,470 $402 178 $4,055 283 $19,765
173,470
kWh
$402
178
kW-months/year
$4,055
283
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas