IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0315 # 08 Y:1987 08 1987 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $894 $1,776 Not Implemented
GT0325 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $1,410 $0 Not Implemented
GT0325 # 02 Y:1987 02 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $226 $300 Implemented
GT0325 # 01 Y:1987 01 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,220 $100 Not Implemented
GT0325 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,100 $7,200 Not Implemented
GT0325 # 05 Y:1987 05 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $387 $321 Not Implemented
GT0327 # 01 Y:1987 01 1987 INSTALL SET-BACK TIMERS $180 $100 Not Implemented
GT0327 # 03 Y:1987 03 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,115 $812 Implemented
GT0327 # 04 Y:1987 04 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,406 $3,500 Implemented
GT0327 # 02 Y:1987 02 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $32,320 $25,000 Implemented
GT0325 # 06 Y:1987 06 1987 INSTALL SET-BACK TIMERS $290 $200 Not Implemented
TN0315 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $5,316 $3,880 Implemented
TN0315 # 03 Y:1987 03 1987 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,598 $3,000 Implemented
TN0315 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,491 $0 Not Implemented
TN0315 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,568 $280 Implemented
GT0327 # 05 Y:1987 05 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,690 $4,300 Not Implemented
TN0315 # 07 Y:1987 07 1987 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $1,202 $2,800 Not Implemented
TN0315 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $8,265 $346 Implemented
TN0315 # 04 Y:1987 04 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,370 $375 Implemented
GT0327 # 06 Y:1987 06 1987 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $15,020 $54,424 Not Implemented
AT0082 # 01 Y:1987 01 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,889 $30,000 Not Implemented
AT0082 # 02 Y:1987 02 1987 RECOVER WASTE HEAT FROM EQUIPMENT $587 $1,500 Implemented
AT0082 # 03 Y:1987 03 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $111 $0 Implemented
AT0082 # 04 Y:1987 04 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $97 $173 Implemented
AT0082 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $0 Implemented