Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0323 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT FOR HEAT | $26,365 | $221,500 | n/a |
TT0323 # 07 Y:2025 | 07 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $12,931 | $18,000 | n/a |
TT0323 # 06 Y:2025 | 06 | 2025 | UTILIZE OUTSIDE CONTRACTING | $27,937 | $30,000 | n/a |
TT0323 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $451 | $0 | n/a |
TT0323 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,234 | $2,520 | n/a |
TT0323 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,028 | $400 | n/a |
TT0323 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $315 | $180 | n/a |
TT0323 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,604 | $2,430 | n/a |
UD1099 # 03 Y:2025 | 03 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,162 | $0 | n/a |
UD1099 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $2,877 | $3,498 | n/a |
UD1099 # 02 Y:2025 | 02 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,105 | $0 | n/a |
UD1099 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,391 | $0 | n/a |
UD1099 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $568 | $0 | n/a |
UD1099 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $283 | $953 | n/a |
UD1099 # 05 Y:2025 | 05 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,633 | $1,322 | n/a |
UD1099 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,580 | $5,371 | n/a |
UD1099 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,032 | $480,632 | n/a |
UD1098 # 01 Y:2025 | 01 | 2025 | INSULATE BARE EQUIPMENT | $5,147 | $1,610 | n/a |
UD1098 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,813 | $5,000 | n/a |
UD1098 # 03 Y:2025 | 03 | 2025 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,529 | $7,106 | n/a |
UD1098 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,612 | $306 | n/a |
UD1098 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,550 | $1,184 | n/a |
UD1098 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $715 | $1,235 | n/a |
UD1098 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $513 | $0 | n/a |
UD1098 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $311 | $509 | n/a |