IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0013 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $781 $1,484 Not Implemented
MU0013 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $5,232 $12,600 Not Implemented
MU0013 # 04 Y:2022 04 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,761 $27,719 Not Implemented
MU0013 # 05 Y:2022 05 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $202 $0 Not Implemented
MU0013 # 06 Y:2022 06 2022 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $51 $30 Implemented
MU0013 # 07 Y:2022 07 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,062 $6,845 Not Implemented
MU0013 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,823 $5,216 Not Implemented
UM0475 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,675 $3,500 n/a
UM0475 # 03 Y:2017 03 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $780 $350 n/a
UM0475 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $713 $3,700 n/a
UM0475 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $8,944 $3,740 n/a
UM0431 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,832 $2,500 Not Implemented
UM0431 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $200 Not Implemented
UM0431 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $25,011 $30,000 Implemented
UM0431 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,730 $38,000 Not Implemented
UMS002 # 02 Y:2012 02 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $67,000 $50,000 Not Implemented
UMS002 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $1,300 $1,000 Not Implemented
UM0353 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,734 $200 Not Implemented
UM0353 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $22,368 $3,000 Implemented
UM0353 # 06 Y:2009 06 2009 USE OPTIMUM TEMPERATURE $13,085 $200 Implemented
UM0353 # 03 Y:2009 03 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,477 $22,000 Not Implemented
UM0353 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,834 $500 Implemented
UM0353 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186,999 $237,500 Implemented
UM0353 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $9,160 $6,330 Not Implemented
UM0353 # 08 Y:2009 08 2009 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,526 $1,500 Implemented