Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
242
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0242 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $287 | $0 | Implemented |
MZ0242 # 02 Y:2017 | 02 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,451 | $550 | Implemented |
MZ0242 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $392 | $50 | Implemented |
MZ0221 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,101 | $1,160 | Implemented |
MZ0221 # 02 Y:2017 | 02 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,200 | $0 | Implemented |
MZ0221 # 03 Y:2017 | 03 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,574 | $100 | Implemented |
MZ0221 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,974 | $0 | Implemented |
MZ0221 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $1,286 | $2,350 | Implemented |
MZ0161 # 01 Y:2014 | 01 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $54,484 | $150,000 | Not Implemented |
MZ0161 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,393 | $11,000 | Not Implemented |
MZ0161 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $36,359 | $45,000 | Not Implemented |
MZ0161 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,710 | $12,000 | Implemented |
MZ0161 # 05 Y:2014 | 05 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $60,132 | $0 | Not Implemented |
MZ0137 # 06 Y:2014 | 06 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $8,378 | $0 | Implemented |
MZ0137 # 07 Y:2014 | 07 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $4,215 | $0 | Not Implemented |
MZ0137 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,678 | $7,200 | Not Implemented |
MZ0137 # 04 Y:2014 | 04 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,610 | $0 | Implemented |
MZ0137 # 03 Y:2014 | 03 | 2014 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $856 | $2,050 | Implemented |
MZ0137 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $1,989 | $1,920 | Implemented |
MZ0137 # 01 Y:2014 | 01 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,036 | $0 | Not Implemented |
MZ0137 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $805 | $1,475 | Implemented |
MZ0124 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,319 | $0 | Not Implemented |
MZ0124 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,890 | $900 | Implemented |
MZ0124 # 02 Y:2013 | 02 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,497 | $15,000 | Not Implemented |
MZ0124 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,532 | $45,540 | Implemented |