Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,110
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0200 # 11 Y:2024 | 11 | 2024 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $335 | $705 | n/a |
IP0200 # 10 Y:2024 | 10 | 2024 | COVER OPEN TANKS | $129 | $246 | n/a |
IP0200 # 09 Y:2024 | 09 | 2024 | INSTALL AUTOMATIC STACK DAMPER | $11,682 | $7,629 | n/a |
IP0200 # 08 Y:2024 | 08 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,218 | $4,577 | n/a |
IP0200 # 07 Y:2024 | 07 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,262 | $328 | n/a |
IP0200 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,977 | $921 | n/a |
IP0200 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,999 | $1,899 | n/a |
IP0200 # 04 Y:2024 | 04 | 2024 | INSTALL SUB-METERING EQUIPMENT | $170,944 | $700 | n/a |
IP0200 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,593 | $0 | n/a |
IP0200 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,451 | $75 | n/a |
IP0200 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,456 | $0 | n/a |
MS0434 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,214 | $329,875 | n/a |
MS0434 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,585 | $25,000 | n/a |
MS0434 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $536 | $1,765 | n/a |
MS0434 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $401 | $879 | n/a |
NL0093 # 15 Y:2024 | 15 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $629 | $818 | n/a |
NL0093 # 14 Y:2024 | 14 | 2024 | INSTALL OCCUPANCY SENSORS | $1,781 | $798 | n/a |
NL0093 # 13 Y:2024 | 13 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $2,101 | $6,000 | n/a |
NL0093 # 12 Y:2024 | 12 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,480 | $5,721 | n/a |
NL0093 # 11 Y:2024 | 11 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,437 | $379 | n/a |
NL0093 # 10 Y:2024 | 10 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $14,300 | $12,229 | n/a |
NL0093 # 09 Y:2024 | 09 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $22,919 | $17,059 | n/a |
NL0093 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,160 | $15,000 | n/a |
NL0093 # 07 Y:2024 | 07 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $26,319 | $63,700 | n/a |
NL0093 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,827 | $11,637 | n/a |