IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,110

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0936 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,521 $1,000 Implemented
UD0936 # 06 Y:2015 06 2015 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $39,316 $29,746 Not Implemented
UD0936 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $1,480 Implemented
UD0936 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,271 $85,000 Implemented
UD0936 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $4,331 $6,300 Not Implemented
UK1512 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,559 $0 Implemented
UK1512 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,043 $1,215 Not Implemented
UK1512 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $4,650 Not Implemented
UK1512 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,209 $3,940 Implemented
UK1512 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,263 $178 Not Implemented
UK1512 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,652 $1,750 Implemented
UK1512 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $4,297 $12,750 Not Implemented
UK1512 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,248 $7,985 Not Implemented
UK1512 # 09 Y:2015 09 2015 INSULATE FEEDWATER TANK $1,278 $994 Implemented
UK1512 # 10 Y:2015 10 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,609 $1,500 Implemented
UK1512 # 11 Y:2015 11 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,535 $530 Not Implemented
UK1512 # 12 Y:2015 12 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $475 Not Implemented
UM0463 # 01 Y:2015 01 2015 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,052,850 $1,822,453 Not Implemented
UM0463 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150,724 $565,274 Implemented
UM0463 # 03 Y:2015 03 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,674 $4,000 Not Implemented
UM0463 # 04 Y:2015 04 2015 CONVERT TO OXYFUEL BURNERS $3,052,580 $1,000,000 Not Implemented
UD0933 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,290 $0 Not Implemented
UD0933 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $36,526 $9,600 Not Implemented
UD0933 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,840 $0 Implemented
UD0933 # 04 Y:2015 04 2015 COVER OPEN TANKS $1,716 $200 Not Implemented