IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0192 # 05 Y:2017 05 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,432 $9,000 Not Implemented
TT0192 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,730 $18,400 Implemented
TT0192 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,001 $3,000 Not Implemented
TT0192 # 08 Y:2017 08 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $3,741 $8,000 Not Implemented
TT0192 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,492 $11,000 Not Implemented
TT0192 # 03 Y:2017 03 2017 INSTALL TIMERS AND/OR THERMOSTATS $7,986 $5,250 Not Implemented
TT0192 # 10 Y:2017 10 2017 DEVELOP A REPAIR/REPLACE POLICY $796 $1,453 Not Implemented
TT0192 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,000 $20,000 Not Implemented
TT0192 # 09 Y:2017 09 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,309 $10,000 Not Implemented
TT0192 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175,487 $344,898 Implemented
OK0959 # 03 Y:2016 03 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $28,465 $350 Not Implemented
OK0959 # 02 Y:2016 02 2016 ELIMINATE/REDUCE AN OPERATION $9,386 $3,640 Not Implemented
OK0959 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $47,214 $105 Not Implemented
OK0959 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,655 $8,500 Not Implemented
OK0954 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,845 $105 Not Implemented
OK0954 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $235,221 $174,014 Not Implemented
OK0954 # 02 Y:2016 02 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $84,389 $6,066 Implemented
OK0954 # 06 Y:2016 06 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $48,345 $350 Not Implemented
OK0954 # 05 Y:2016 05 2016 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $6,862 $3,640 Implemented
OK0954 # 04 Y:2016 04 2016 ELIMINATE/REDUCE AN OPERATION $62,368 $3,640 Not Implemented
OK0885 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $42,502 $2,889 Implemented
OK0885 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,111 $1,900 Implemented
OK0885 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $10,088 $12,319 Implemented
AR0188 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $734 $2,130 Implemented
AR0188 # 04 Y:2000 04 2000 OPTIMIZE PLANT POWER FACTOR $7,860 $6,250 Not Implemented