IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

156

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0061 # 04 Y:2024 04 2024 INSTALL SET-BACK TIMERS $24,478 $160,704 n/a
MU0061 # 07 Y:2024 07 2024 USE RADIANT HEATER FOR SPOT HEATING $2,592 $10,260 n/a
MU0061 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89 $114 n/a
MU0061 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,426 $12,734 n/a
MU0061 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,134 $0 n/a
MU0061 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $246 $339 n/a
MU0061 # 09 Y:2024 09 2024 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $370 $1,608 n/a
MU0061 # 08 Y:2024 08 2024 INSTALL TIMERS AND/OR THERMOSTATS $393 $580 n/a
MU0061 # 01 Y:2024 01 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,468 $4,140 n/a
TR0059 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,395 $4,000 n/a
TR0059 # 04 Y:2024 04 2024 METER WASTE WATER $5,966 $1,570 n/a
TR0059 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $148,771 $739,065 n/a
TR0059 # 01 Y:2024 01 2024 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $36,781 $32,522 n/a
UD1093 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,442 $953 n/a
UD1093 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,247 $720 n/a
UD1093 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,446 $9,639 n/a
UD1093 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,522 $2,450 n/a
UD1093 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,271 $772 n/a
UD1093 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,379 $1,330 n/a
UD1093 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,573 $48,200 n/a
UD1093 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,360 $48,200 n/a
UD1093 # 09 Y:2024 09 2024 OPTIMIZE PLANT POWER FACTOR $13,480 $31,200 n/a
UD1092 # 02 Y:2024 02 2024 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,755 $0 n/a
UD1092 # 03 Y:2024 03 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,477 $5,670 n/a
UD1092 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $23,052 $34,302 n/a