Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1110 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,358 | $0 | n/a |
UD1110 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,182 | $953 | n/a |
UD1110 # 08 Y:2025 | 08 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,078 | $19,900 | n/a |
UD1110 # 09 Y:2025 | 09 | 2025 | OPTIMIZE PLANT POWER FACTOR | $27,844 | $76,225 | n/a |
UD1110 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,072 | $1,464 | n/a |
UD1110 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,927 | $8,803 | n/a |
UD1110 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,733 | $17,500 | n/a |
UD1110 # 06 Y:2025 | 06 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,326 | $4,060 | n/a |
UD1110 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $961 | $0 | n/a |
MU0064 # 14 Y:2025 | 14 | 2025 | INSTALL OCCUPANCY SENSORS | $751 | $541 | n/a |
MU0064 # 17 Y:2025 | 17 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $152 | $753 | n/a |
MU0064 # 16 Y:2025 | 16 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $2,121 | $1,483 | n/a |
MU0064 # 15 Y:2025 | 15 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $137 | $0 | n/a |
MU0064 # 01 Y:2025 | 01 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $12,744 | $56,850 | n/a |
MU0064 # 13 Y:2025 | 13 | 2025 | INSTALL SET-BACK TIMERS | $35,464 | $50,350 | n/a |
MU0064 # 12 Y:2025 | 12 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $495 | $0 | n/a |
MU0064 # 11 Y:2025 | 11 | 2025 | KEEP EQUIPMENT CLEAN | $1,393 | $0 | n/a |
MU0064 # 10 Y:2025 | 10 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,331 | $1,688 | n/a |
MU0064 # 09 Y:2025 | 09 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,961 | $35,691 | n/a |
MU0064 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,750 | $79,396 | n/a |
MU0064 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $39,818 | $496,424 | n/a |
MU0064 # 06 Y:2025 | 06 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,424 | $305 | n/a |
MU0064 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,419 | $0 | n/a |
MU0064 # 04 Y:2025 | 04 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $21,996 | $361 | n/a |
MU0064 # 03 Y:2025 | 03 | 2025 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $25,072 | $83,850 | n/a |