Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 3716 | Motor Homes |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0437 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,846 | $114,679 | Implemented |
IA0437 # 15 Y:2009 | 15 | 2009 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,324 | $10,000 | Not Implemented |
IA0437 # 14 Y:2009 | 14 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,644 | $15,500 | Not Implemented |
IA0437 # 13 Y:2009 | 13 | 2009 | INSULATE BARE EQUIPMENT | $5,401 | $10,500 | Not Implemented |
IA0437 # 12 Y:2009 | 12 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $16,602 | $60,000 | Implemented |
IA0437 # 11 Y:2009 | 11 | 2009 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,292 | $2,000 | Not Implemented |
IA0437 # 10 Y:2009 | 10 | 2009 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $7,336 | $7,337 | Not Implemented |
IA0437 # 09 Y:2009 | 09 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $986 | $216 | Implemented |
IA0437 # 07 Y:2009 | 07 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,416 | $500 | Not Implemented |
IA0437 # 06 Y:2009 | 06 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,380 | $626 | Implemented |
IA0437 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,135 | $31,226 | Implemented |
IA0437 # 04 Y:2009 | 04 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $13,962 | $2,381 | Implemented |
IA0437 # 03 Y:2009 | 03 | 2009 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,046 | $228 | Implemented |
IA0437 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,974 | $329,643 | Implemented |
IA0437 # 08 Y:2009 | 08 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,190 | $1,045 | Implemented |
WV0388 # 13 Y:2009 | 13 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $246 | $400 | Not Implemented |
WV0388 # 12 Y:2009 | 12 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $282 | $590 | Not Implemented |
WV0388 # 11 Y:2009 | 11 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $321 | $0 | Not Implemented |
WV0388 # 10 Y:2009 | 10 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $749 | $572 | Not Implemented |
WV0388 # 09 Y:2009 | 09 | 2009 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,757 | $4,680 | Not Implemented |
WV0388 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,801 | $34 | Implemented |
WV0388 # 07 Y:2009 | 07 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,366 | $3,122 | Implemented |
WV0388 # 06 Y:2009 | 06 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,424 | $6,259 | Implemented |
WV0388 # 05 Y:2009 | 05 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,746 | $560 | Implemented |
WV0388 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,130 | $1,763 | Implemented |