Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,431
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0212 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $568 | $0 | n/a |
WM0212 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $698 | $1,730 | n/a |
WM0212 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $886 | $2,650 | n/a |
WM0212 # 01 Y:2024 | 01 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,593 | $0 | n/a |
SD0648 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,994 | $4,000 | n/a |
SD0648 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,906 | $4,828 | n/a |
SD0648 # 03 Y:2024 | 03 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $15,800 | $12,200 | n/a |
SD0648 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $113,272 | $30,051 | n/a |
SD0648 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $824,443 | $529,751 | n/a |
SD0648 # 06 Y:2024 | 06 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $409,025 | $0 | n/a |
SD0648 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $35,974 | $2,600 | n/a |
SD0648 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,384 | $2,234 | n/a |
SD0648 # 09 Y:2024 | 09 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $364,878 | $49,250 | n/a |
SD0648 # 10 Y:2024 | 10 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,121 | $10,016 | n/a |
SD0648 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,340 | $15,608 | n/a |
SD0648 # 12 Y:2024 | 12 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $982,749 | $783,575 | n/a |
SD0648 # 13 Y:2024 | 13 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $793 | $1,336 | n/a |
UW2319 # 06 Y:2023 | 06 | 2023 | USER BATTERY STORAGE FOR POWER QUALITY ISSUES | $750,000 | $871,000 | n/a |
UW2319 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,789 | $3,000 | n/a |
UW2319 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,443 | $68,000 | n/a |
UW2319 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,001 | $2,820 | n/a |
UW2319 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,837 | $2,080 | n/a |
UW2319 # 01 Y:2023 | 01 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $56,470 | $23,651 | n/a |
UA0281 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,002 | $15,154 | n/a |
UA0281 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,483 | $47,040 | n/a |