Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,491
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0894 # 12 Y:2014 | 12 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $21,347 | $52,000 | Not Implemented |
TT0139 # 01 Y:2014 | 01 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $117 | $126 | Not Implemented |
TT0139 # 02 Y:2014 | 02 | 2014 | DISCONNECT BALLASTS | $280 | $100 | Implemented |
TT0139 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,460 | $500 | Implemented |
TT0139 # 04 Y:2014 | 04 | 2014 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $76,287 | $2,900 | Not Implemented |
SD0486 # 01 Y:2014 | 01 | 2014 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $75,586 | $286,300 | Not Implemented |
SD0486 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $54,581 | $250,000 | Not Implemented |
SD0486 # 03 Y:2014 | 03 | 2014 | REDUCE SCRAP PRODUCTION | $29,967 | $30,993 | Not Implemented |
SD0486 # 04 Y:2014 | 04 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,957 | $4,985 | Not Implemented |
SD0486 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,274 | $22,000 | Not Implemented |
SD0486 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,270 | $600 | Not Implemented |
SD0486 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $600 | Not Implemented |
OK0887 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,397 | $35,374 | Implemented |
OK0887 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $7,219 | $3,969 | Implemented |
OK0887 # 03 Y:2014 | 03 | 2014 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $8,717 | $3,613 | Implemented |
OK0887 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $1,814 | $8,926 | Implemented |
OK0887 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,474 | $11,975 | Implemented |
OK0887 # 06 Y:2014 | 06 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $13,990 | $0 | Implemented |
OK0887 # 07 Y:2014 | 07 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,993 | $0 | Implemented |
OK0880 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $706 | $689 | Not Implemented |
OK0880 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $302 | $463 | Not Implemented |
OK0880 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,983 | $61,440 | Implemented |
OK0880 # 04 Y:2014 | 04 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $12,695 | $8,800 | Not Implemented |
OK0880 # 05 Y:2014 | 05 | 2014 | USE RADIANT HEATER FOR SPOT HEATING | $10,569 | $37,500 | Not Implemented |
OK0880 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $227 | $798 | Not Implemented |