IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,485

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0221 # 06 Y:1999 06 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $1,922 $1,922 Implemented
SD0221 # 07 Y:1999 07 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,002 $0 Implemented
GT0657 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $53,008 $75,650 n/a
GT0657 # 02 Y:1999 02 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,270 $5,000 n/a
GT0657 # 03 Y:1999 03 1999 METER WASTE WATER $2,793 $200 n/a
GT0657 # 04 Y:1999 04 1999 CONVERT TO ELECTROSTATIC POWDER COATING $23,418 $1,000 n/a
GT0657 # 05 Y:1999 05 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,997 $160 n/a
GT0657 # 06 Y:1999 06 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,779 $400 n/a
GT0657 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,617 $25,504 n/a
GT0657 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $94,225 $35,250 n/a
GT0657 # 09 Y:1999 09 1999 USE A RAG RECYCLE SERVICE $65,262 $0 n/a
GT0657 # 10 Y:1999 10 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,410 $2,400 n/a
MA0420 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $34,950 $29,006 Implemented
MA0420 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,722 $5,940 Not Implemented
MA0420 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,382 $6,000 Not Implemented
MA0420 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $1,724 $195 Implemented
IA0205 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,263 $51,347 Not Implemented
IA0205 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,633 $3,261 Implemented
IA0205 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $67 $100 Not Implemented
IA0205 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $950 Not Implemented
IA0205 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $211 $310 Not Implemented
IA0205 # 06 Y:1998 06 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,860 $400 Implemented
IA0205 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,680 $5,250 Implemented
IA0205 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $119,822 $290,000 Implemented
IA0205 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $42,573 $15,000 Not Implemented