Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,528
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0173 # 03 Y:1999 | 03 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,515 | $4,140 | Not Implemented |
WV0173 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $379 | $648 | Implemented |
WV0173 # 05 Y:1999 | 05 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $33,645 | $34,820 | Not Implemented |
WV0173 # 06 Y:1999 | 06 | 1999 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,850 | $0 | Not Implemented |
WV0173 # 07 Y:1999 | 07 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $17,068 | $0 | Not Implemented |
WV0173 # 08 Y:1999 | 08 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,183 | $576 | Implemented |
WV0173 # 09 Y:1999 | 09 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,080 | $55 | Implemented |
WV0173 # 10 Y:1999 | 10 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $458,008 | $16,192 | Implemented |
WV0173 # 11 Y:1999 | 11 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $426 | $0 | Implemented |
WV0173 # 12 Y:1999 | 12 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $83,200 | $1,673 | Not Implemented |
AS0255 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,341 | $20,474 | Not Implemented |
AS0255 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $358 | $442 | Not Implemented |
AS0255 # 03 Y:1999 | 03 | 1999 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,365 | $195 | Not Implemented |
AS0255 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,392 | $120 | Not Implemented |
AS0255 # 05 Y:1999 | 05 | 1999 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,137 | $14,500 | Not Implemented |
AS0255 # 06 Y:1999 | 06 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,779 | $120 | Not Implemented |
AS0255 # 07 Y:1999 | 07 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,261 | $60 | Not Implemented |
AS0255 # 08 Y:1999 | 08 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $12,000 | $1,500 | Implemented |
WV0172 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $51 | $140 | Implemented |
WV0172 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $1,494 | $4,830 | Not Implemented |
WV0172 # 03 Y:1999 | 03 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,202 | $9,072 | Not Implemented |
WV0172 # 04 Y:1999 | 04 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,682 | $2,520 | Implemented |
WV0172 # 05 Y:1999 | 05 | 1999 | INSTALL SET-BACK TIMERS | $90 | $0 | Implemented |
WV0172 # 06 Y:1999 | 06 | 1999 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,160 | $2,730 | Not Implemented |
WV0172 # 07 Y:1999 | 07 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $182 | $600 | Not Implemented |