IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,448

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0083 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $306 $198 Not Implemented
AS0083 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,718 $94 Not Implemented
AS0083 # 08 Y:1993 08 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,058 $5,250 Not Implemented
AS0083 # 09 Y:1993 09 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $746 $1,300 Not Implemented
SD0053 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,264 $1,803 Implemented
SD0053 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,892 $6,584 Implemented
SD0053 # 03 Y:1993 03 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,557 $19,600 Implemented
SD0053 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,738 $280 Not Implemented
SD0053 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,579 $3,520 Not Implemented
MO0079 # 01 Y:1993 01 1993 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $27,437 $28,187 Not Implemented
MO0079 # 02 Y:1993 02 1993 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,147 $1,375 Implemented
MO0079 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,050 $30 Implemented
MO0079 # 04 Y:1993 04 1993 USE SYNTHETIC LUBRICANT $341 $144 Implemented
MO0079 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $886 $2,324 Implemented
MO0079 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $463 $145 Implemented
MO0079 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $771 $1,919 Implemented
MO0079 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $292 $100 Implemented
TN0482 # 01 Y:1993 01 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $18,977 $30,900 n/a
TN0482 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,459 $1,504 n/a
TN0482 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,234 $600 n/a
TN0482 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $923 $185 n/a
TN0482 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $277 $720 n/a
TN0482 # 06 Y:1993 06 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,141 $0 n/a
AS0076 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,862 $65,800 Not Implemented
AS0076 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $0 Implemented