IAC logo
IAC Assessment: AS0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1995
Principal Product Turbine Engine Components
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 45,000
Annual Production 500,000 Pieces
Production Hrs. Annual 7,488
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $251,883 3,719,519 kWh $0.07
Natural Gas $13,675 2,313 MMBtu $5.91
TOTAL ENERGY COSTS $265,558
RECOMMENDED SAVINGS* $70,587 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$17,480
Cost:
$12,523
$17,480 267,585 - - $17,480
267,585
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,251
Cost:
-
$5,251 80,891 - - $5,251
80,891
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$618
Cost:
$1,210
$618 9,379 - - $618
9,379
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,078
Cost:
$1,000
- - $3,078 521 -
-
kWh
$3,078
521
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,309
Cost:
$1,200
$11,309 180,246 - - $11,309
180,246
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,535
Cost:
$18,701
$12,535 195,193 - - $12,535
195,193
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$432
Cost:
$656
$432 7,034 - - $432
7,034
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$389
Cost:
$600
$389 6,448 - - $389
6,448
kWh
-
-
MMBtu
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,722
Cost:
$1,360
$2,346 34,584 $(-624) (-106) $2,346
34,584
kWh
$(-624)
(-106)
MMBtu
10: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$17,773
Cost:
$54,725
$17,773 243,845 - - $17,773
243,845
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$70,587
Cost:
$91,975
$68,133 1,025,205 $2,454 415 $68,133
1,025,205
kWh
$2,454
415
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas