IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

285

matching recommendations
Reset
SIC 3724 Aircraft Engines And Engine Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0335 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $78 Implemented
OK0335 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $162 $395 Implemented
AS0008 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,178 $0 Implemented
AS0008 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,719 $1,000 Implemented
AS0008 # 05 Y:1990 05 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,966 $100 Implemented
AS0008 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,623 $1,058 Implemented
AS0008 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,544 $2,708 Implemented
OK0192 # 03 Y:1986 03 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,057 $3,500 Implemented
OK0192 # 05 Y:1986 05 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,547 $32,800 Implemented
OK0192 # 07 Y:1986 07 1986 RECOVER AND REUSE COOLING WATER $96,689 $52,800 Implemented
KU0133 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,390 $10,201 Implemented
KU0133 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $870 $1,810 Implemented
KU0133 # 03 Y:1984 03 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,922 $7,500 Implemented
KU0133 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,567 $1,589 Implemented
KU0133 # 06 Y:1984 06 1984 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $4,813 $2,800 Implemented
KU0133 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,626 $0 Implemented
KU0133 # 09 Y:1984 09 1984 INSTALL AUTOMATIC STACK DAMPER $1,231 $3,300 Implemented
KU0133 # 10 Y:1984 10 1984 RECOVER WASTE HEAT FROM EQUIPMENT $3,584 $2,900 Implemented
KU0133 # 11 Y:1984 11 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,316 $450 Implemented
KU0133 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,130 $113 Implemented
KU0133 # 13 Y:1984 13 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,562 $0 Implemented
KU0133 # 14 Y:1984 14 1984 INSULATE BARE EQUIPMENT $669 $400 Implemented
KU0133 # 15 Y:1984 15 1984 INSULATE BARE EQUIPMENT $626 $450 Implemented
KU0133 # 16 Y:1984 16 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $378 $0 Implemented
KU0133 # 17 Y:1984 17 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $365 $144 Implemented