IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0083 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $183 $550 Implemented
AS0083 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $511 $0 Implemented
AS0083 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $306 $198 Not Implemented
AS0083 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,718 $94 Not Implemented
AS0083 # 08 Y:1993 08 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,058 $5,250 Not Implemented
AS0083 # 09 Y:1993 09 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $746 $1,300 Not Implemented
AS0076 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,862 $65,800 Not Implemented
AS0076 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $0 Implemented
AS0076 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,612 $12,391 Not Implemented
AS0076 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $2,128 Not Implemented
AS0076 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $137 $250 Not Implemented
AS0076 # 06 Y:1993 06 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,339 $2,035 Not Implemented
AS0076 # 07 Y:1993 07 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,191 $4,400 Not Implemented
AS0076 # 08 Y:1993 08 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,260 $18,920 Not Implemented
AS0076 # 09 Y:1993 09 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,126 $0 Implemented
AS0076 # 10 Y:1993 10 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $219 $329 Implemented
AS0076 # 11 Y:1993 11 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $381 $0 Implemented
AS0054 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $125,830 $500,000 Not Implemented
AS0054 # 02 Y:1992 02 1992 USE UTILITY CONTROLLED POWER MANAGEMENT $12,703 $25,000 Implemented
AS0054 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,278 $18,136 Implemented
AS0054 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,936 $1,803 Implemented
AS0054 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15 $147 Implemented
AS0054 # 06 Y:1992 06 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,062 $2,400 Not Implemented
AS0054 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,880 $100 Implemented
AS0029 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $669 $97 Implemented