Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,680

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0205 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $356 $950 Not Implemented
IA0205 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $211 $310 Not Implemented
IA0205 # 06 Y:1998 06 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,860 $400 Implemented
IA0205 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,680 $5,250 Implemented
IA0205 # 08 Y:1998 08 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $119,822 $290,000 Implemented
IA0205 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $42,573 $15,000 Not Implemented
IA0205 # 10 Y:1998 10 1998 ELIMINATE/REDUCE AN OPERATION $38,166 $2,000 Implemented
OK0552 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,497 $26,747 Implemented
OK0552 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,699 $25,866 Not Implemented
OK0552 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $819 $700 Implemented
OK0552 # 04 Y:1998 04 1998 INSTALL OCCUPANCY SENSORS $873 $651 Implemented
OK0552 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $142 $54 Implemented
OK0552 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $581 $375 Implemented
OK0552 # 07 Y:1998 07 1998 REDUCE EXCESSIVE BOILER BLOWDOWN $1,324 $5,000 Implemented
OK0552 # 08 Y:1998 08 1998 INSULATE BARE EQUIPMENT $193 $209 Implemented
OK0552 # 09 Y:1998 09 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,072 $7,000 Not Implemented
OK0552 # 10 Y:1998 10 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,474 $6,000 Not Implemented
OK0552 # 11 Y:1998 11 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,909 $15,000 Not Implemented
OK0552 # 12 Y:1998 12 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,291 $3,000 Not Implemented
OD0114 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,198 $1,457 Implemented
OD0114 # 02 Y:1998 02 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $143 $80 Implemented
OD0114 # 03 Y:1998 03 1998 SHUT OFF PILOTS IN STANDBY EQUIPMENT $35 $10 Implemented
OD0114 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,303 $509 Implemented
OD0114 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,123 $50 Not Implemented
OD0114 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $538 $1,010 Not Implemented