IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3728 Aircraft Parts And Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0045 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,375 $310 Implemented
AR0045 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,249 $200 Implemented
AR0045 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,176 $3,090 Implemented
AR0045 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,513 $0 Implemented
AR0045 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,479 $531 Implemented
CO0297 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,150 $34,110 Not Implemented
CO0297 # 08 Y:1994 08 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $290 $530 Not Implemented
CO0297 # 07 Y:1994 07 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,120 $920 Not Implemented
CO0297 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,200 $5,880 Not Implemented
CO0297 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,280 $3,260 Implemented
CO0297 # 04 Y:1994 04 1994 REUSE RAGS UNTIL COMPLETELY SOILED $4,520 $1,160 Not Implemented
CO0297 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,820 $3,430 Implemented
CO0297 # 01 Y:1994 01 1994 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $21,300 $16,000 Not Implemented
AS0113 # 07 Y:1994 07 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,531 $20,250 Not Implemented
AS0113 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,076 $3,108 Implemented
AS0113 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $547 $2,110 Not Implemented
AS0113 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $447 $250 Implemented
AS0113 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $381 $0 Not Implemented
AS0113 # 02 Y:1994 02 1994 USE PHOTOCELL CONTROLS $297 $30 Not Implemented
AS0113 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,597 $4,361 Not Implemented
KU0422 # 01 Y:1994 01 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $502 $3,380 Implemented
KU0422 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $148 $1,575 Implemented
KU0422 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $1,703 Implemented
KU0422 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $275 $1,300 Implemented
KU0422 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $166 $416 Implemented