IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 373 Ship And Boat Building And Repairing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0563 # 02 Y:2004 02 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,769 $650 Implemented
MA0563 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $257 $155 Not Implemented
MA0563 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $116 $0 Implemented
MA0563 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $39,550 $12,000 Implemented
ME0227 # 10 Y:1997 10 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $540 $1,188 Implemented
ME0227 # 09 Y:1997 09 1997 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,200 $0 Not Implemented
ME0227 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $217 $185 Implemented
ME0227 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $359 $100 Implemented
ME0227 # 06 Y:1997 06 1997 USE OPTIMUM THICKNESS INSULATION $408 $75 Implemented
ME0227 # 05 Y:1997 05 1997 PAY BILLS ON TIME TO AVOID LATE FEES $512 $0 Not Implemented
ME0227 # 04 Y:1997 04 1997 USE OPTIMUM THICKNESS INSULATION $515 $588 Implemented
ME0227 # 03 Y:1997 03 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $756 $0 Implemented
ME0227 # 02 Y:1997 02 1997 USE OPTIMUM THICKNESS INSULATION $790 $960 Implemented
ME0227 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,383 $7,504 Implemented
ME0134 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $546 $400 Not Implemented
ME0134 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $598 $300 Implemented
ME0134 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,743 $400 Implemented
ME0134 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,500 $1,050 Not Implemented
ME0134 # 01 Y:1994 01 1994 INSTALL OCCUPANCY SENSORS $300 $150 Implemented
ME0105 # 04 Y:1993 04 1993 MOVE BOILER TO MORE EFFICIENT LOCATION $256 $200 Implemented
ME0105 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $579 $1,405 Implemented
ME0105 # 02 Y:1993 02 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,846 $22,500 Not Implemented
ME0105 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,631 $1,344 Implemented