Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 373 | Ship And Boat Building And Repairing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0098 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,453 | $132 | Implemented |
BS0098 # 10 Y:2017 | 10 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,240 | $400 | Implemented |
BS0098 # 09 Y:2017 | 09 | 2017 | DISCONNECT BALLASTS | $21 | $15 | Implemented |
BS0098 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $45 | $130 | Not Implemented |
BS0098 # 07 Y:2017 | 07 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $48 | $15 | Implemented |
BS0098 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $148 | $480 | Implemented |
BS0098 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $345 | $412 | Implemented |
BS0098 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $406 | $18 | Implemented |
BS0098 # 03 Y:2017 | 03 | 2017 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $601 | $1,100 | Implemented |
BS0098 # 01 Y:2017 | 01 | 2017 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $5,881 | $50,450 | Implemented |
LE0437 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $12,220 | $7,000 | Not Implemented |
LE0437 # 08 Y:2017 | 08 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,363 | $60,000 | Not Implemented |
LE0437 # 07 Y:2017 | 07 | 2017 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $86,210 | $200,000 | Not Implemented |
LE0437 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,862 | $12,000 | Not Implemented |
LE0437 # 05 Y:2017 | 05 | 2017 | INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES | $35,693 | $50,000 | Not Implemented |
LE0437 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,482 | $14,000 | Not Implemented |
LE0437 # 03 Y:2017 | 03 | 2017 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $37,770 | $36,000 | Not Implemented |
LE0437 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,208 | $20,000 | Not Implemented |