Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsSIC | 3743 | Railroad Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0253 # 08 Y:2021 | 08 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $245 | $25 | Implemented |
TT0253 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,898 | $70,582 | Implemented |
TT0253 # 05 Y:2021 | 05 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $479 | $900 | Implemented |
TT0253 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $281 | $500 | Implemented |
TT0253 # 01 Y:2021 | 01 | 2021 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $63,457 | $40,000 | Implemented |
WV0560 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,101 | $10,000 | Implemented |
WV0560 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,007 | $1,200 | Implemented |
WV0560 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,821 | $180 | Implemented |
WV0560 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,154 | $80 | Implemented |
WV0560 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $1,679 | $1,400 | Implemented |
WV0518 # 01 Y:2016 | 01 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $17,135 | $20,642 | Implemented |
WV0518 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $5,682 | $3,428 | Implemented |
WV0518 # 06 Y:2016 | 06 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $6,437 | $7,861 | Implemented |
WV0518 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,416 | $500 | Implemented |
WV0518 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,512 | $706 | Implemented |
WV0518 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,361 | $21,950 | Implemented |
WV0518 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,011 | $128 | Implemented |
WV0518 # 02 Y:2016 | 02 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,399 | $914 | Implemented |
WV0518 # 12 Y:2016 | 12 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $556 | $2,428 | Implemented |
WV0518 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $2,986 | $510 | Implemented |
BS0036 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,898 | $2,032 | Implemented |
BS0036 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,963 | $937 | Implemented |
MZ0129 # 01 Y:2013 | 01 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $56,550 | $18,200 | Implemented |
MZ0129 # 05 Y:2013 | 05 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,763 | $63,637 | Implemented |
MZ0129 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,082 | $1,800 | Implemented |