Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
354
matching recommendationsSIC | 379 | Miscellaneous Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0263 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,566 | $6,725 | Not Implemented |
TT0263 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,663 | $88,815 | Implemented |
TT0263 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,140 | $5,000 | Not Implemented |
TT0263 # 04 Y:2021 | 04 | 2021 | ADOPT IN-HOUSE MATERIAL GENERATION | $9,686 | $17,700 | Not Implemented |
TT0263 # 01 Y:2021 | 01 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $45,807 | $72,000 | Not Implemented |
NC0622 # 08 Y:2018 | 08 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,727 | $28,500 | Not Implemented |
NC0622 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,812 | $46,617 | Implemented |
NC0622 # 09 Y:2018 | 09 | 2018 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $15,903 | $500 | Implemented |
NC0622 # 07 Y:2018 | 07 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,221 | $1,000 | Not Implemented |
NC0622 # 04 Y:2018 | 04 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $161 | $450 | Not Implemented |
NC0622 # 05 Y:2018 | 05 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,361 | $6,000 | Not Implemented |
NC0622 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $481 | $250 | Implemented |
NC0622 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,414 | $525 | Implemented |
NC0622 # 06 Y:2018 | 06 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,913 | $8,000 | Not Implemented |
BS0113 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,622 | $100 | Not Implemented |
BS0113 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,211 | $360 | Not Implemented |
BS0113 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $193 | Not Implemented |
BS0113 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,656 | $2,640 | Not Implemented |
UA0180 # 06 Y:2017 | 06 | 2017 | PAY BILLS ON TIME TO AVOID LATE FEES | $296 | $0 | Implemented |
UA0180 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,029 | $400 | Not Implemented |
UA0180 # 07 Y:2017 | 07 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $327 | $735 | Implemented |
UA0180 # 05 Y:2017 | 05 | 2017 | MODIFY STARTUP/SHUTDOWN TIMES | $2,873 | $0 | Not Implemented |
UA0180 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,799 | $2,645 | Implemented |
UA0180 # 02 Y:2017 | 02 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,724 | $3,250 | Not Implemented |
UA0180 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,573 | $25,654 | Not Implemented |