IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
Reset
SIC 379 Miscellaneous Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0346 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $121 $109 Implemented
KU0346 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $453 $100 Implemented
KU0346 # 09 Y:1991 09 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $311 $0 Implemented
KU0346 # 10 Y:1991 10 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $201 $0 Implemented
KU0291 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $669 $0 Implemented
KU0291 # 04 Y:1989 04 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82 $117 Implemented
KU0291 # 05 Y:1989 05 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $500 $0 Implemented
KU0291 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $886 $150 Implemented
AM0050 # 02 Y:1989 02 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $508 $500 Implemented
AM0050 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $940 $400 Implemented
AM0050 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50 $44 Implemented
AM0050 # 05 Y:1989 05 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $111 $40 Implemented
LT0108 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,860 $1,200 Implemented
LT0108 # 02 Y:1987 02 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $693 $1,071 Implemented
LT0108 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,177 $339 Implemented
KU0128 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,484 $300 Implemented
KU0128 # 02 Y:1984 02 1984 INSTALL AUTOMATIC STACK DAMPER $4,147 $3,200 Implemented
KU0128 # 04 Y:1984 04 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,023 $1,273 Implemented
KU0128 # 05 Y:1984 05 1984 KEEP BOILER TUBES CLEAN $942 $64 Implemented
KU0128 # 07 Y:1984 07 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $268 $50 Implemented
UD0104 # 01 Y:1983 01 1983 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $39,300 $0 Implemented
UD0104 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,527 $0 Implemented
UD0104 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $10,180 $4,000 Implemented
UD0104 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,605 $1,592 Implemented
UD0104 # 05 Y:1983 05 1983 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,680 $3,100 Implemented