IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

354

matching recommendations
Reset
SIC 379 Miscellaneous Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0059 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,092 $300 Implemented
IA0059 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,455 $0 Implemented
IA0059 # 03 Y:1993 03 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $8,568 $27,000 Implemented
IA0059 # 04 Y:1993 04 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,390 $5,850 Implemented
IA0059 # 05 Y:1993 05 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $264 $0 Implemented
IA0059 # 06 Y:1993 06 1993 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $8,376 $1,543 Not Implemented
IA0059 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,828 $1,740 Implemented
IA0059 # 08 Y:1993 08 1993 INSTALL OCCUPANCY SENSORS $1,072 $1,530 Implemented
IA0059 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $978 $120 Implemented
UD0375 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,213 $0 Implemented
UD0375 # 02 Y:1992 02 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,988 $2,000 Implemented
UD0375 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $5,702 $0 Implemented
OK0376 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $189 $554 Implemented
OK0376 # 01 Y:1992 01 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,222 $3,222 Implemented
OK0376 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $782 $782 Not Implemented
OK0376 # 03 Y:1992 03 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,133 $1,133 Implemented
OK0376 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $777 $777 Implemented
OK0376 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $388 $388 Implemented
OK0376 # 06 Y:1992 06 1992 SHUT OFF PILOTS IN STANDBY EQUIPMENT $388 $561 Not Implemented
IA0016 # 01 Y:1992 01 1992 AIR CONDITION ONLY SPACE NECESSARY $38,385 $29,200 Implemented
IA0016 # 02 Y:1992 02 1992 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,600 $30,400 Not Implemented
IA0016 # 03 Y:1992 03 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,252 $4,400 Not Implemented
IA0016 # 04 Y:1992 04 1992 INSULATE BARE EQUIPMENT $116 $120 Not Implemented
IA0016 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,678 $500 Not Implemented
IA0016 # 06 Y:1992 06 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,791 $1,200 Implemented