IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0513 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $44,875 $580,160 Not Implemented
AS0513 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $15,767 $43,000 Not Implemented
AS0513 # 05 Y:2022 05 2022 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,700 $453 Not Implemented
AS0513 # 06 Y:2022 06 2022 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,454 $122 Not Implemented
AS0513 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $1,979 $1,772 Not Implemented
AS0513 # 08 Y:2022 08 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,143 $411 Not Implemented
UA0246 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,600 $9,695 Implemented
UA0246 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,152 $150 Not Implemented
UA0246 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,692 $373 Not Implemented
UA0246 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $855 $1,067 Implemented
OR0746 # 01 Y:2022 01 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,050 $2,975 Not Implemented
OR0746 # 02 Y:2022 02 2022 ELIMINATE/REDUCE AN OPERATION $2,177 $49 Implemented
OR0746 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $38,605 $550,846 Not Implemented
SD0619 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,059 $4,547 Implemented
SD0619 # 02 Y:2021 02 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,715 $4,000 Not Implemented
SD0619 # 03 Y:2021 03 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $83,606 $387,000 Not Implemented
MI0388 # 01 Y:2021 01 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $132,105 $960 Not Implemented
MI0388 # 02 Y:2021 02 2021 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $86,796 $86,796 Not Implemented
MI0388 # 03 Y:2021 03 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $32,022 $38,081 Implemented
MI0388 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $31,640 $80 Implemented
MI0388 # 05 Y:2021 05 2021 REPAIR OR REPLACE STEAM TRAPS $13,798 $4,080 Implemented
IP0146 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $469 $0 Implemented
IP0146 # 02 Y:2021 02 2021 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $7,392 $260 Implemented
IP0146 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,150 $50 Implemented
IP0146 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,959 $3,259 Implemented