Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,140
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0044 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,951 | $29,928 | Implemented |
NL0044 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,983 | $20 | Implemented |
NL0044 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,007 | $1,000 | Implemented |
NL0044 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $693 | $1,400 | Not Implemented |
NL0044 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $285 | $20 | Not Implemented |
NL0044 # 06 Y:2020 | 06 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $111 | $50 | Implemented |
CL2001 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,200 | $61,410 | Implemented |
CL2001 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $584,752 | $499,000 | Not Implemented |
CL2001 # 03 Y:2020 | 03 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,354 | $0 | Implemented |
CL2001 # 04 Y:2020 | 04 | 2020 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $350 | $0 | Not Implemented |
NL0040 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $106,822 | $130,000 | Not Implemented |
NL0040 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $38,925 | $150,000 | Not Implemented |
NL0040 # 03 Y:2019 | 03 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $25,402 | $1,697 | Implemented |
NL0040 # 04 Y:2019 | 04 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $16,450 | $4,500 | Implemented |
NL0040 # 05 Y:2019 | 05 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $10,400 | $51,350 | Implemented |
NL0040 # 06 Y:2019 | 06 | 2019 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $9,900 | $3,660 | Not Implemented |
NL0040 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,049 | $18,439 | Implemented |
NL0040 # 08 Y:2019 | 08 | 2019 | RECYCLE WHITE WATER | $2,649 | $1,000 | Implemented |
IC0222 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,363 | $2,231 | Implemented |
IC0222 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $757 | $320 | Not Implemented |
IC0222 # 03 Y:2019 | 03 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $524 | $0 | Not Implemented |
IC0223 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $210 | $24 | Not Implemented |
IC0223 # 02 Y:2019 | 02 | 2019 | INSTALL SPECTRAL REFLECTORS / DELAMP | $267 | $2,000 | Not Implemented |
IC0223 # 03 Y:2019 | 03 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $264 | $0 | Not Implemented |
IC0223 # 04 Y:2019 | 04 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $550 | $0 | Implemented |