IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0139 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,499 $5,941 Not Implemented
KU0139 # 02 Y:1984 02 1984 RECOVER WASTE HEAT FROM EQUIPMENT $1,988 $3,000 Not Implemented
KU0139 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $818 $100 Not Implemented
KU0139 # 04 Y:1984 04 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,181 $1,600 Not Implemented
KU0139 # 05 Y:1984 05 1984 IMPROVE LUBRICATION PRACTICES $593 $500 Not Implemented
KU0139 # 07 Y:1984 07 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $103 $0 Not Implemented
KU0139 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $118 $0 Not Implemented
KU0139 # 09 Y:1984 09 1984 INSULATE BARE EQUIPMENT $148 $64 Not Implemented
KU0102 # 06 Y:1983 06 1983 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $341 $0 Not Implemented
KU0102 # 05 Y:1983 05 1983 INSTALL TIMERS AND/OR THERMOSTATS $808 $1,200 Not Implemented
KU0102 # 04 Y:1983 04 1983 INSTALL AUTOMATIC STACK DAMPER $824 $700 Implemented
KU0102 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,241 $360 Not Implemented
KU0102 # 02 Y:1983 02 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,389 $4,000 Implemented
KU0102 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $612 $1,228 Not Implemented
KU0082 # 02 Y:1983 02 1983 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $741 $147 Not Implemented
KU0082 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $221 $200 Implemented
KU0082 # 04 Y:1983 04 1983 INSTALL AUTOMATIC STACK DAMPER $171 $336 Implemented
KU0082 # 05 Y:1983 05 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $91 $40 Not Implemented
KU0082 # 06 Y:1983 06 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $76 $0 Not Implemented
KU0082 # 07 Y:1983 07 1983 REDUCE FLUID FLOW RATES $77 $8 Implemented
KU0082 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $893 $923 Not Implemented