IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

214

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0804 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $100,108 $144,760 Implemented
MA0804 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $227,379 $500 Not Implemented
MA0793 # 06 Y:2018 06 2018 REDUCE VENTILATION AIR $419 $1,000 Not Implemented
MA0793 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,323 $28,940 Not Implemented
MA0793 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,582 $5,974 Implemented
MA0793 # 03 Y:2018 03 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,289 $5,525 Not Implemented
MA0793 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,012 $500 Implemented
MA0793 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $1,522 $1,000 Not Implemented
MA0789 # 05 Y:2018 05 2018 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,779 $960 Not Implemented
MA0789 # 04 Y:2018 04 2018 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $2,881 $6,120 Not Implemented
MA0789 # 03 Y:2018 03 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,660 $1,200 Not Implemented
MA0789 # 02 Y:2018 02 2018 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $9,053 $960 Not Implemented
MA0789 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,415 $29,288 Implemented
MA0783 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $2,760 Implemented
MA0783 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,297 $14,420 Implemented
MA0783 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,697 $19,975 Not Implemented
MA0783 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $17,909 $431,094 Not Implemented
MA0775 # 04 Y:2017 04 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,486 $21,000 Not Implemented
MA0775 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $28,320 $16,929 Not Implemented
MA0775 # 02 Y:2017 02 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,697 $100 Implemented
MA0775 # 03 Y:2017 03 2017 AIR CONDITION ONLY SPACE NECESSARY $13,365 $7,900 Not Implemented
MA0775 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,966 $20,488 Not Implemented
MA0775 # 06 Y:2017 06 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $708 $412 Not Implemented
MA0770 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $1,809 $2,784 Implemented
MA0770 # 01 Y:2017 01 2017 REDUCE VENTILATION AIR $8,661 $1,503 Not Implemented