IAC logo
IAC Assessment: MA0804
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0804
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2019
Principal Product Surgical and medical instruments
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 642,000
Annual Production 10,000 Units
Production Hrs. Annual 3,120
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $497,889 3,772,949 kWh $0.13
Electricity Demand $205,885 28,887 kW-months/year $7.13
Electricity Fees $35,944 - $ -
Natural Gas $311,713 49,826 MMBtu $6.26
TOTAL ENERGY COSTS $1,051,431
RECOMMENDED SAVINGS* $355,875 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $103,256
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$227,379
Cost:
$500
$(-26,277) (-877,500) $253,656 16,595 - - - - $(-26,277)
(-877,500)
kWh
$253,656
16,595
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$100,108
Cost:
$144,760
$87,778 664,987 $12,330 1,730 - - - - $87,778
664,987
kWh
$12,330
1,730
kW-months/year
-
-
$
-
-
MMBtu
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$25,240
Cost:
$1,000
- - - - $25,240 - - - -
-
kWh
-
-
kW-months/year
$25,240
-
$
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,014
Cost:
$300
$2,014 15,258 - - - - - - $2,014
15,258
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,134
Cost:
$1,000
- - - - - - $1,134 129 -
-
kWh
-
-
kW-months/year
-
-
$
$1,134
129
MMBtu
TOTAL RECOMMENDED Savings:
$355,875
Cost:
$147,560
$63,515 (-197,255) $265,986 18,325 $25,240 - $1,134 129 $63,515
(-197,255)
kWh
$265,986
18,325
kW-months/year
$25,240
-
$
$1,134
129
MMBtu
TOTAL IMPLEMENTED Savings:
$103,256
Cost:
$146,060
$89,792 680,245 $12,330 1,730 - - $1,134 129 $89,792
680,245
kWh
$12,330
1,730
kW-months/year
-
-
$
$1,134
129
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas