IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0071 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $1,330 $1,200 Implemented
LM0071 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,879 $0 Implemented
LM0071 # 06 Y:2004 06 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $99,668 $24,000 Not Implemented
LM0071 # 07 Y:2004 07 2004 MODIFY CURRENT INCENTIVE PROGRAM $3,000 $300 Implemented
LM0071 # 08 Y:2004 08 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $214,912 $3,000 Not Implemented
LM0071 # 09 Y:2004 09 2004 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $252,500 $35,000 Not Implemented
LM0071 # 10 Y:2004 10 2004 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $84,322 $100,000 Implemented
OK0668 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,150 $61,955 Not Implemented
OK0668 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,013 $38,456 Implemented
OK0668 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $6,113 $1,885 Implemented
OK0668 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,597 $0 Implemented
OK0668 # 05 Y:2003 05 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $67,238 $0 Implemented
OK0668 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,821 $1,125 Implemented
OK0668 # 07 Y:2003 07 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $50,260 $51,780 Not Implemented
OK0668 # 08 Y:2003 08 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,772 $9,500 Not Implemented
OK0668 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $1,369 $1,455 Implemented
OK0668 # 10 Y:2003 10 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,501 $6,296 Not Implemented
OK0668 # 11 Y:2003 11 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,447 $112,608 n/a
OK0668 # 12 Y:2003 12 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,404 $34,425 n/a
OK0668 # 13 Y:2003 13 2003 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $38,034 $1,647 Implemented
GT0745 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $1,646 $264 Not Implemented
GT0745 # 02 Y:2003 02 2003 COMBINE UTILITY METERS $996 $0 Not Implemented
GT0745 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,387 $5,000 Implemented
GT0745 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,711 $0 Implemented
GT0745 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,124 $12,499 Implemented