IAC Assessment: WV0316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2005
Principal Product Orthopedic Supplies
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 140,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $349,628 6,048,941 kWh $0.06
Electricity Fees $4,991 - $ -
Natural Gas $177,051 20,434 MMBtu $8.66
TOTAL ENERGY COSTS $531,670
RECOMMENDED SAVINGS* $47,361 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,854
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$10,848
Cost:
$1,000
- - $11,388 1,315 $(-540) - - - -
-
kWh
$11,388
1,315
MMBtu
$(-540)
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,434
Cost:
-
$9,554 179,023 - - $(-120) - - - $9,554
179,023
kWh
-
-
MMBtu
$(-120)
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,222
Cost:
-
$5,222 88,941 - - - - - - $5,222
88,941
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$4,152
Cost:
$2,375
$4,152 70,812 - - - - - - $4,152
70,812
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,816
Cost:
$580
- - $3,816 441 - - - - -
-
kWh
$3,816
441
MMBtu
-
-
$
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,317
Cost:
$1,705
- - $3,317 383 - - - - -
-
kWh
$3,317
383
MMBtu
-
-
$
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,199
Cost:
$1,000
- - $3,559 411 $(-360) - - - -
-
kWh
$3,559
411
MMBtu
$(-360)
-
$
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,722
Cost:
-
$994 16,960 - - $1,080 - $648 - $994
16,960
kWh
-
-
MMBtu
$1,080
-
$
$648
-
$
09: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$2,491
Cost:
$60
$2,491 42,487 - - - - - - $2,491
42,487
kWh
-
-
MMBtu
-
-
$
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$825
Cost:
$141
$825 14,064 - - - - - - $825
14,064
kWh
-
-
MMBtu
-
-
$
-
-
$
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$783
Cost:
$70
- - $783 90 - - - - -
-
kWh
$783
90
MMBtu
-
-
$
-
-
$
12: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$552
Cost:
$345
$912 15,529 - - $(-360) - - - $912
15,529
kWh
-
-
MMBtu
$(-360)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$47,361
Cost:
$7,276
$24,150 427,816 $22,863 2,640 $(-300) - $648 - $24,150
427,816
kWh
$22,863
2,640
MMBtu
$(-300)
-
$
$648
-
$
TOTAL IMPLEMENTED Savings:
$30,854
Cost:
$2,616
$14,776 268,063 $15,730 1,816 $(-300) - $648 - $14,776
268,063
kWh
$15,730
1,816
MMBtu
$(-300)
-
$
$648
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost