IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,140

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0287 # 08 Y:2001 08 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $39,000 $5,247 Implemented
UF0287 # 09 Y:2001 09 2001 PAY UTILITY BILLS ON TIME $15,147 $0 Not Implemented
UF0287 # 10 Y:2001 10 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $29,250 $3,000 Implemented
NC0224 # 01 Y:2001 01 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,086 $7,500 Implemented
NC0224 # 02 Y:2001 02 2001 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $16,136 $45,000 Not Implemented
NC0224 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,746 $5,000 Not Implemented
NC0224 # 04 Y:2001 04 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $19,065 $40,000 Implemented
NC0224 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,339 $1,690 Implemented
NC0224 # 06 Y:2001 06 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $113 $300 Implemented
MI0024 # 01 Y:2001 01 2001 ISOLATE HOT OR COLD EQUIPMENT $156,000 $10,000 n/a
MI0024 # 02 Y:2001 02 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,590 $7 n/a
MI0024 # 03 Y:2001 03 2001 ADD AREA LIGHTING SWITCHES $2,108 $1,000 n/a
MI0024 # 04 Y:2001 04 2001 ADD AREA LIGHTING SWITCHES $1,333 $700 n/a
MI0024 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $2 n/a
CO0488 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,910 $3,000 Implemented
CO0488 # 02 Y:2001 02 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,300 $6,000 Not Implemented
CO0488 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,660 $2,200 Not Implemented
CO0488 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,650 $0 Implemented
CO0488 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $900 $0 Implemented
CO0488 # 06 Y:2001 06 2001 REPLACE HEAVY METAL REAGENTS WITH NON-HAZARDOUS REAGENTS $21,060 $14,000 Not Implemented
CO0488 # 07 Y:2001 07 2001 USE CYLINDRICAL TANKS WITH HEIGHT TO DIAMETER RATIOS CLOSE TO ONE TO REDUCE WETTED SURFACE $3,610 $180 Implemented
WI0403 # 01 Y:2001 01 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $82,500 $120,000 Not Implemented
WI0403 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $20,523 $0 Implemented
WI0403 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,035 $9,500 Not Implemented
WI0403 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,569 $16,804 Not Implemented