IAC logo
IAC Assessment: CO0517
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0517
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2002
Principal Product Aerospace electronic components
NAICS 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812 - Search And Navigation Equipment
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 173,400
Annual Production 2,300 Pieces
Production Hrs. Annual 4,420
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,978 3,448,960 kWh $0.05
Electricity Demand $33,419 9,518 kW-months/year $3.51
Electricity Fees $71,004 - $ -
Natural Gas $43,283 10,305 MMBtu $4.20
TOTAL ENERGY COSTS $314,684
RECOMMENDED SAVINGS* $33,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,930
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$26,170
Cost:
$55,600
$15,760 398,900 - - $10,410 2,413 - - $15,760
398,900
kWh
-
-
kW-months/year
$10,410
2,413
MMBtu
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$3,900
Cost:
$5,000
- - $3,900 337 - - - - -
-
kWh
$3,900
337
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,640
Cost:
$800
$1,600 35,300 $560 48 - - $(-520) - $1,600
35,300
kWh
$560
48
kW-months/year
-
-
MMBtu
$(-520)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,290
Cost:
$2,740
$660 15,000 $630 54 - - - - $660
15,000
kWh
$630
54
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$33,000
Cost:
$64,140
$18,020 449,200 $5,090 439 $10,410 2,413 $(-520) - $18,020
449,200
kWh
$5,090
439
kW-months/year
$10,410
2,413
MMBtu
$(-520)
-
$
TOTAL IMPLEMENTED Savings:
$2,930
Cost:
$3,540
$2,260 50,300 $1,190 102 - - $(-520) - $2,260
50,300
kWh
$1,190
102
kW-months/year
-
-
MMBtu
$(-520)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes