IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0074 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $1,627 $450 Not Implemented
NL0074 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,436 $19,905 Not Implemented
NL0074 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,687 $5,590 Not Implemented
NL0074 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $859 $1,225 Not Implemented
NL0074 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $72,974 $20,000 Not Implemented
NL0074 # 01 Y:2022 01 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $214,263 $4,242 Not Implemented
NL0074 # 07 Y:2022 07 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $432 $90 Not Implemented
NL0069 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $599 $1,397 Not Implemented
NL0069 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,908 $110,400 Not Implemented
NL0069 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,221 $1,069 Not Implemented
NL0069 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $10,312 $3,180 Not Implemented
NL0069 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $459,130 $2,266,822 Not Implemented
NL0069 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $64,154 $20,000 Not Implemented
NL0069 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $100,270 $900 Not Implemented
NL0044 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,951 $29,928 Implemented
NL0044 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,983 $20 Implemented
NL0044 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,007 $1,000 Implemented
NL0044 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $693 $1,400 Not Implemented
NL0044 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $285 $20 Not Implemented
NL0044 # 06 Y:2020 06 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $111 $50 Implemented
NL0040 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,049 $18,439 Implemented
NL0040 # 02 Y:2019 02 2019 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $38,925 $150,000 Not Implemented
NL0040 # 06 Y:2019 06 2019 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $9,900 $3,660 Not Implemented
NL0040 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $10,400 $51,350 Implemented
NL0040 # 03 Y:2019 03 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $25,402 $1,697 Implemented