IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1101 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,266 $952 n/a
UD1101 # 05 Y:2025 05 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,284 $0 n/a
UD1101 # 09 Y:2025 09 2025 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $310 $1,350 n/a
UD1101 # 10 Y:2025 10 2025 INSTALL OCCUPANCY SENSORS $94 $0 n/a
UD1101 # 02 Y:2025 02 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,997 $6,792 n/a
UD1101 # 04 Y:2025 04 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,619 $1,015 n/a
UD1101 # 08 Y:2025 08 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $430 $1,040 n/a
UD1101 # 03 Y:2025 03 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,750 $7,500 n/a
UD1101 # 01 Y:2025 01 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $8,143 $0 n/a
UD1101 # 07 Y:2025 07 2025 RECOVER WASTE HEAT FROM EQUIPMENT $2,622 $4,975 n/a
UD1101 # 11 Y:2025 11 2025 OPTIMIZE PLANT POWER FACTOR $1,101 $4,400 n/a
UD1053 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,937 $0 Not Implemented
UD1053 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $7,370 $110,000 Implemented
UD1053 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $103,216 $145,725 Not Implemented
UD1053 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,100 $201,500 Not Implemented
UD1053 # 09 Y:2023 09 2023 OPTIMIZE PLANT POWER FACTOR $46,233 $119,156 Not Implemented
UD1053 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $288,790 $110,000 Implemented
UD1053 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,097 $110,000 Implemented
UD1053 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,508 $19,116 Not Implemented
UD1053 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,943 $0 Not Implemented
UD1044 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,125 $2,940 Not Implemented
UD1044 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $1,611 $900 Not Implemented
UD1044 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $318 $0 Implemented
UD1044 # 03 Y:2022 03 2022 REDUCE VENTILATION AIR $6,187 $750 Not Implemented
UD1044 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $704 $0 Not Implemented