Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0008 # 02 Y:1984 | 02 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,146 | $4,000 | Not Implemented |
CO0008 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $6,065 | $597 | Implemented |
CO0008 # 04 Y:1984 | 04 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $305 | $200 | Not Implemented |
CO0008 # 05 Y:1984 | 05 | 1984 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $253 | $24 | Not Implemented |
CO0008 # 06 Y:1984 | 06 | 1984 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $1,255 | $500 | Implemented |
KU0139 # 09 Y:1984 | 09 | 1984 | INSULATE BARE EQUIPMENT | $148 | $64 | Not Implemented |
KU0139 # 08 Y:1984 | 08 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $118 | $0 | Not Implemented |
KU0139 # 07 Y:1984 | 07 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $103 | $0 | Not Implemented |
KU0139 # 06 Y:1984 | 06 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $389 | $500 | Not Implemented |
KU0139 # 05 Y:1984 | 05 | 1984 | IMPROVE LUBRICATION PRACTICES | $593 | $500 | Not Implemented |
KU0139 # 04 Y:1984 | 04 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,181 | $1,600 | Not Implemented |
KU0139 # 03 Y:1984 | 03 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $818 | $100 | Not Implemented |
CO0008 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,129 | $3,063 | Implemented |
KU0139 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,499 | $5,941 | Not Implemented |
KU0139 # 02 Y:1984 | 02 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,988 | $3,000 | Not Implemented |
GT0224 # 08 Y:1984 | 08 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,780 | $11,625 | Not Implemented |
GT0224 # 07 Y:1984 | 07 | 1984 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $1,190 | $3,000 | Not Implemented |
GT0224 # 06 Y:1984 | 06 | 1984 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $180 | $350 | Not Implemented |
GT0224 # 05 Y:1984 | 05 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $70 | $149 | Implemented |
GT0224 # 04 Y:1984 | 04 | 1984 | DISCONNECT BALLASTS | $60 | $50 | Implemented |
GT0224 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,510 | $2,350 | Implemented |
GT0224 # 02 Y:1984 | 02 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,340 | $2,300 | Not Implemented |
GT0224 # 01 Y:1984 | 01 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $390 | $300 | Implemented |
TN0208 # 01 Y:1984 | 01 | 1984 | AIR CONDITION ONLY SPACE NECESSARY | $2,708 | $132 | Not Implemented |
TN0208 # 02 Y:1984 | 02 | 1984 | INSTALL STORM WINDOWS AND DOORS | $731 | $123 | Not Implemented |