IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0316 # 07 Y:2005 07 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,199 $1,000 Implemented
WV0316 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,722 $0 Implemented
WV0316 # 09 Y:2005 09 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,491 $60 Implemented
WV0316 # 10 Y:2005 10 2005 INSULATE BARE EQUIPMENT $825 $141 Implemented
WV0316 # 11 Y:2005 11 2005 INSULATE BARE EQUIPMENT $783 $70 Implemented
WV0316 # 12 Y:2005 12 2005 DEVELOP A REPAIR/REPLACE POLICY $552 $345 Implemented
MA0576 # 01 Y:2005 01 2005 INSTALL TIMERS AND/OR THERMOSTATS $33,608 $2,000 Not Implemented
MA0576 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,240 $3,120 Implemented
MA0576 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,578 $7,342 Implemented
MA0576 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,505 $4,283 Implemented
LE0210 # 01 Y:2005 01 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,350 $6,560 Not Implemented
LE0210 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,088 $750 Implemented
LE0210 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,616 $2,000 Implemented
LE0210 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,330 $4,866 Implemented
LE0210 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $366 $140 Not Implemented
LE0210 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $80 Implemented
LE0210 # 07 Y:2005 07 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $147 $360 Not Implemented
UU0084 # 01 Y:2005 01 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,643 $6,171 Not Implemented
UU0084 # 02 Y:2005 02 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $697 $2,150 Not Implemented
UU0084 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,537 $0 Not Implemented
UU0084 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $506 $235 Not Implemented
UU0084 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $491 $200 Not Implemented
UU0084 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $4,429 $5,220 Not Implemented
UU0084 # 07 Y:2005 07 2005 COMBINE UTILITY METERS $575 $315 Not Implemented
IA0361 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $781 $25 Not Implemented