Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,723
matching recommendationsSIC | 382 | Measuring And Controlling Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0876 # 05 Y:2014 | 05 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $168 | $15 | Not Implemented |
OK0876 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,040 | $645 | Not Implemented |
OK0876 # 07 Y:2014 | 07 | 2014 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,400 | $30 | Not Implemented |
OK0876 # 08 Y:2014 | 08 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $41,800 | $54,000 | Not Implemented |
MI0254 # 01 Y:2014 | 01 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $66,980 | $10,999 | Implemented |
MI0254 # 02 Y:2014 | 02 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $45,927 | $80 | Implemented |
MI0254 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,716 | $3,100 | Implemented |
MI0254 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,333 | $7,040 | Not Implemented |
MI0254 # 05 Y:2014 | 05 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,159 | $2,206 | Not Implemented |
MI0254 # 06 Y:2014 | 06 | 2014 | OPTIMIZE PLANT POWER FACTOR | $5,083 | $7,680 | Implemented |
MI0254 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,680 | $2,160 | Implemented |
MI0254 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,949 | $13,170 | Implemented |
MI0254 # 09 Y:2014 | 09 | 2014 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $3,341 | $600 | Not Implemented |
MI0254 # 10 Y:2014 | 10 | 2014 | INSTALL OCCUPANCY SENSORS | $3,162 | $800 | Implemented |
MI0254 # 11 Y:2014 | 11 | 2014 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,914 | $520 | Not Implemented |
MI0254 # 12 Y:2014 | 12 | 2014 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,523 | $240 | Implemented |
MI0254 # 13 Y:2014 | 13 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $727 | $1,660 | Implemented |
MI0254 # 14 Y:2014 | 14 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $447 | $80 | Implemented |
CO0682 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,080 | $9,950 | Not Implemented |
CO0682 # 02 Y:2014 | 02 | 2014 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $42,490 | $93,580 | Not Implemented |
CO0682 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,860 | $5,750 | Not Implemented |
CO0682 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $1,250 | $1,240 | Not Implemented |
OK0868 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,347 | $750 | Implemented |
OK0868 # 02 Y:2013 | 02 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,626 | $14,640 | Not Implemented |
OK0868 # 03 Y:2013 | 03 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,572 | $7,700 | Implemented |