Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2015 |
Principal Product | Clinical Laboratory Instruments |
NAICS | 333249 - Other Industrial Machinery Manufacturing |
SIC | 3821 - Laboratory Apparatus And Furniture |
Sales | $100,000,000-$500,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 85,000,000 Pieces |
Production Hrs. Annual | 2,600 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $285,841 | 5,694,920 | kWh | $0.05 |
Electricity Demand | $104,154 | 7,978 | kW-months/year | $13.06 |
Electricity Fees | $73,033 | - | $ | - |
Natural Gas | $91,783 | 8,271 | MMBtu | $11.10 |
TOTAL ENERGY COSTS | $569,556 | |||
RECOMMENDED SAVINGS* | $136,689 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $75,898 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS |
Savings: $49,371 Cost: $1,400 |
- | - | - | - | $49,371 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$49,371 - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $29,534 Cost: $20,088 |
$17,158 | 343,159 | $12,376 | 948 | - | - | - | - | - | - |
$17,158 343,159 kWh |
$12,376 948 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $19,500 Cost: $80 |
$14,330 | 286,594 | $5,170 | 396 | - | - | - | - | - | - |
$14,330 286,594 kWh |
$5,170 396 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $12,676 Cost: $3,600 |
$12,676 | 253,510 | - | - | - | - | - | - | - | - |
$12,676 253,510 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $5,181 Cost: $4,080 |
$3,771 | 75,420 | $1,410 | 108 | - | - | - | - | - | - |
$3,771 75,420 kWh |
$1,410 108 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,773 Cost: $2,040 |
$1,710 | 34,204 | $2,063 | 158 | - | - | - | - | - | - |
$1,710 34,204 kWh |
$2,063 158 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $3,506 Cost: $1,140 |
- | - | - | - | - | - | $3,506 | 316 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$3,506 316 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,926 Cost: $7,869 |
$1,359 | 27,181 | $1,567 | 120 | - | - | - | - | - | - |
$1,359 27,181 kWh |
$1,567 120 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,351 Cost: $3,960 |
- | - | - | - | - | - | $2,351 | 212 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,351 212 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,546 Cost: $5,294 |
$867 | 17,336 | $679 | 52 | - | - | - | - | - | - |
$867 17,336 kWh |
$679 52 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $1,475 Cost: $560 |
- | - | - | - | - | - | - | - | $1,475 | 54,403 |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$1,475 54,403 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,467 Cost: $1,660 |
$1,389 | 27,788 | $78 | 6 | - | - | - | - | - | - |
$1,389 27,788 kWh |
$78 6 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,282 Cost: $645 |
$922 | 18,464 | $360 | 28 | - | - | - | - | - | - |
$922 18,464 kWh |
$360 28 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,131 Cost: $1,220 |
$1,131 | 22,613 | - | - | - | - | - | - | - | - |
$1,131 22,613 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $970 Cost: $80 |
$631 | 12,615 | $339 | 26 | - | - | - | - | - | - |
$631 12,615 kWh |
$339 26 kW-months/year |
- - $ |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $136,689 Cost: $53,716 |
$55,944 | 1,118,884 | $24,042 | 1,842 | $49,371 | - | $5,857 | 528 | $1,475 | 54,403 | $55,944 1,118,884 kWh |
$24,042 1,842 kW-months/year |
$49,371 - $ |
$5,857 528 MMBtu |
$1,475 54,403 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $75,898 Cost: $41,851 |
$50,120 | 1,002,387 | $22,272 | 1,706 | - | - | $3,506 | 316 | - | - | $50,120 1,002,387 kWh |
$22,272 1,706 kW-months/year |
- - $ |
$3,506 316 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Solid Waste (non-haz) |