IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 382 Measuring And Controlling Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0796 # 02 Y:2009 02 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,992 $1,525 Implemented
UD0796 # 13 Y:2009 13 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $149 $0 Implemented
UD0796 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $284 $0 Implemented
UD0796 # 11 Y:2009 11 2009 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $364 $250 Not Implemented
UD0796 # 10 Y:2009 10 2009 INSTALL AUTOMATIC STACK DAMPER $418 $400 Implemented
UD0796 # 09 Y:2009 09 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $788 $0 Implemented
UD0796 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $935 $2,115 Implemented
UD0796 # 07 Y:2009 07 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,104 $10,500 Not Implemented
UD0796 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,734 $500 Implemented
UD0796 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,866 $2,500 Not Implemented
UD0796 # 03 Y:2009 03 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,237 $0 Implemented
UD0713 # 02 Y:2005 02 2005 USE OPTIMUM TEMPERATURE $64,754 $2,500 Not Implemented
UD0713 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,021 $3,807 Implemented
UD0713 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,925 $200 Implemented
UD0713 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,868 $22,600 Not Implemented
UD0713 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,628 $3,900 Not Implemented
UD0713 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,435 $41,783 Implemented
UD0713 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,867 $94,373 Not Implemented
UD0568 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,154 $2,000 Not Implemented
UD0568 # 03 Y:1999 03 1999 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $5,171 $4,000 Implemented
UD0568 # 02 Y:1999 02 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $5,475 $7,000 Not Implemented
UD0568 # 01 Y:1999 01 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $8,393 $3,600 Not Implemented
UD0497 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $1,514 $1,500 Not Implemented
UD0497 # 02 Y:1996 02 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,460 $300 Not Implemented
UD0497 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,035 $20,230 Implemented